-----Original Message-----
From: Haag, William J Lt Col USAF EUCOM ECJ7 (USA)
<william.j.haag.mil@mail.mil>
Sent: Monday, October 26, 2020 4:07 PM
To: Haim Ravid <hrmolds@netvision.net.il>; Exterkate, Linda M CTR (USA)
<linda.m.exterkate.ctr@mail.mil>
Cc: Hooper, Thomas M CTR EUCOM ECJ7 (USA) <thomas.m.hooper2.ctr@mail.mil>;
O'Neill, Michael H CIV JS J7 (USA) <michael.h.oneill.civ@mail.mil>; Winkler,
Paul H CTR JS J7 (USA) <paul.h.winkler.ctr@mail.mil>
Subject: RE: [Non-DoD Source] RE: MSEL Update
Hello Haim and Linda,
Tomorrow, we will rehearse our Level II review @1600 CET/ 1700 IST on
chicken, bridge 1/rm#2 in preparation for our Wednesday meeting.
Please let me know how, you would like to run this.
Feel free to call.
BRs, William
William "Judy" Haag, Lt Col, USAF
ECJ7-JTrEx, Joint Training and Exercise Planner
DSN: 314-430-2203
Comm: +49 (0) 711 680 2203
William.j.haag.mil@mail.mil
William.j.haag.mil@mail.smil.mil
-----Original Message-----
From: Haim Ravid [
mailto:hrmolds@netvision.net.il]
Sent: Wednesday, September 16, 2020 6:16 AM
To: Exterkate, Linda M CTR (USA) <linda.m.exterkate.ctr@mail.mil>; Haag,
William J Lt Col USAF EUCOM ECJ7 (USA) <william.j.haag.mil@mail.mil>
Cc: 'Haim Ravid' <hrmolds@netvision.net.il>
Subject: [Non-DoD Source] RE: MSEL Update
All active links contained in this email were disabled. Please verify the
identity of the sender, and confirm the authenticity of all links contained
within the message prior to copying and pasting the address to a Web
browser.
________________________________
Hello Linda,
I will upload today during our morning all our slides after we arrange them,
actually they are ready and uploaded to the portal since end-IPC, but I will
re-arrange .
Since the MSEL conf. (especially for JF that we have only 1 MSEL conf.) is
for printing injects, this is what we came to do, I pushed to have the JTIMS
up and running, with your help it was ready on Saturday, Sunday I have
arranged all needed with our drafters, so that Monday morning we started
printing our KE and injects.
The KE were coordinated and agreed with US side during the IPC conf. via VC
and phone calls. As far as I know, we do not have KE that were not
coordinated with US side Cell Members.
The IDF TO list is also uploaded to the portal since end IPC, in an excel
format. No need to discuss them, only to take a look if any of our TO need
to be de-conflicted with your TOs this is a quite rare thing.
I also do not like the use of the term "MSEL Sync." That everyone are using
now, it is a confusing and wrong term at this stage. I will talk again with
my team today to stop using it, we will use MSEL crosswalk. (anyway I will
try.. They have cached the "Sync." Word and keep using) .
So today after we go over the slides, if we have time left we go over the KE
in the JTIMS tool, I do not think it is "a must", we can do it in the
beginning of MPC.
But if we will have some time left, we can go over the KE in the JTIMS for
the main cells, AIR, SEA, BMD ..
For your points -
If I may suggest,
1. Review/confirm TO list - No need to review, or confirm IDF TO, we
usually send it to you, and you upload them to the tool.
2. Develop Storylines using Level 1-2-3 charts (attention to Phases and
dates- especially when cutting and pasting from previous exercises/slides) -
OK, they are ready I will re arrange and upload.
3. Ensure only true Key Events are charted (all injects are important -
not all are Key) - Done. We have printed in 350 injects and 62 KE.
4. Crosswalk Storylines (last day) - like # 2 here, we will discuss
them during todays VC .
Thank you and hope today it goes better, the line at your side was VERY bad,
we really could not understand anything from what you are saying..at EUCOM
side it sounds much better.
Best regards,
Eng. Haim Ravid
Sunrise Engineering -
Sales Engineer
Prototypes Production Manager
Consulting
Cel: +972-544-340360
Tel: +972-3-9066916
Fax: +972-3-9364578
Caution-http://www.zriha.com <
blocked::blocked::Caution-http://www.zriha.com/ >
From: Exterkate, Linda M CTR (USA) <linda.m.exterkate.ctr@mail.mil>
Sent: Tuesday, September 15, 2020 7:40 PM
To: Haim Ravid <hrmolds@netvision.net.il>; Haag, William J Lt Col USAF EUCOM
ECJ7 (USA) <william.j.haag.mil@mail.mil>
Subject: MSEL Update
Lt Col Ravid/Haag,
Just got off the phone with Tom Hooper and he confirmed SG is down on
both sides (EUCOM/JS). Unfortunately, I was unable to load the templates
on before it crashed so I've attached them here and will load them as soon
as possible tomorrow morning when/if the system is up.
So, I think we are all in agreement that the MSEL review could have gone
better today. The mikes, the masks, the screen issues all contributed. For
my part, I wanted to apologize for not sending LtCol Ravid a heads up on the
slides - between the JTIMS server delay and my ROM I was in a rush to get
them done and just posted today. I will definitely let you know if I post
anything to the MSEL folders in the future.
And, as Lt Col Ravid said, moving forward we will leave all the current
injects in the JMSEL Tool and then all the Syndicates will work on their
Level 1-2-3 charts. After the MSEL Crosswalk we can make the necessary
adjustments. I am very pleased to hear this since this is the standard JS
process used for Storyline-MSEL development. Experience has proven that
MSELs/Storylines are best developed using the building block approach. It
may seem like a step backward, and extra time but when the Quad/Fishbone
slides are completely filled out, the MSEL inject will almost write itself
so it is time very well spent. My analogy is painting a room. It's all
about the prep which always takes longer than actually painting. But if you
do the prep right, the last part of throwing on the paint is a breeze.
Speaking of building blocks, I also have some concerns over the Training
Objectives. It is the first block/step and I have yet to see a
comprehensive, approved list. I have made "Placeholder TOs" in the tool but
in theory all Storylines should first be based on a TO. I have seen some
of the IDF TOs in the folder but I would like to discuss those over the SG
phone soonest.
MSEL Crosswalk vs MSEL Sync. There is actually a difference. MSEL
Development with a MSEL Crosswalk is what we are trying to accomplish this
week during the Planning Phase. A MSEL Sync is only during PRE_STARTEX in
the EXECUTION phase. (per Jt Staff Exercise Handbook)
Lastly, are the Syndicate slides. As was mentioned in the briefing, some of
the storylines were from JC and in the wrong Phase and many of the dates
were wrong even though I used the "approved" final versions from the IPC.
Bottom line is I think taking the time to step back now and review our steps
is absolutely the best course.
If I may suggest,
1. Review/confirm TO list
2. Develop Storylines using Level 1-2-3 charts (attention to Phases and
dates- especially when cutting and pasting from previous exercises/slides)
3. Ensure only true Key Events are charted (all injects are important -
not all are Key)
4. Crosswalk Storylines (last day)
Your thoughts?
v/r Ex
LINDA "EX" EXTERKATE
Joint Staff J7, JST, Valiant
JMSEL Manager
COMM: +1 (757) 203-7941 EST
DSN: (668) 203-7941
NIPR: Linda.M.Exterkate.ctr@mail.mil <
Caution-mailto:Linda.M.Exterkate.ctr@mail.mil >
SIPR: Linda.M.Exterkate.ctr@mail.smil.mil <
Caution-mailto:Linda.M.Exterkate.ctr@mail.smil.mil >