התשובות שלי.
Best regards,
Eng. Haim Ravid
Sunrise Engineering –
Sales Engineer
Prototypes Production Manager
Consulting
Cel: +972-544-340360
Tel: +972-3-9066916
Fax: +972-3-9364578
From: Haim Ravid <hrmolds@netvision.net.il>
Sent: Wednesday, September 16, 2020 7:16 AM
To: 'Exterkate, Linda M CTR (USA)' <linda.m.exterkate.ctr@mail.mil>; 'Haag, William J Lt Col USAF EUCOM ECJ7 (USA)' <william.j.haag.mil@mail.mil>
Cc: 'Haim Ravid (hrmolds@netvision.net.il)' <hrmolds@netvision.net.il>
Subject: RE: MSEL Update
Hello Linda,
I will upload today during our morning all our slides after we arrange them, actually they are ready and uploaded to the portal since end-IPC, but I will re-arrange .
Since the MSEL conf. (especially for JF that we have only 1 MSEL conf.) is for printing injects, this is what we came to do, I pushed to have the JTIMS up and running, with your help it was ready on Saturday, Sunday I have arranged all needed with our drafters, so that Monday morning we started printing our KE and injects.
The KE were coordinated and agreed with US side during the IPC conf. via VC and phone calls. As far as I know, we do not have KE that were not coordinated with US side Cell Members.
The IDF TO list is also uploaded to the portal since end IPC, in an excel format. No need to discuss them, only to take a look if any of our TO need to be de-conflicted with your TOs this is a quite rare thing.
I also do not like the use of the term “MSEL Sync.” That everyone are using now, it is a confusing and wrong term at this stage. I will talk again with my team today to stop using it, we will use MSEL crosswalk. (anyway I will try…. They have cached the “Sync.” Word and keep using) .
So today after we go over the slides, if we have time left we go over the KE in the JTIMS tool, I do not think it is “a must”, we can do it in the beginning of MPC.
But if we will have some time left, we can go over the KE in the JTIMS for the main cells, AIR, SEA, BMD ……
For your points –
If I may suggest,
Thank you and hope today it goes better, the line at your side was VERY bad, we really could not understand anything from what you are saying……at EUCOM side it sounds much better.
Best regards,
Eng. Haim Ravid
Sunrise Engineering –
Sales Engineer
Prototypes Production Manager
Consulting
Cel: +972-544-340360
Tel: +972-3-9066916
Fax: +972-3-9364578
From: Exterkate, Linda M CTR (USA) <linda.m.exterkate.ctr@mail.mil>
Sent: Tuesday, September 15, 2020 7:40 PM
To: Haim Ravid <hrmolds@netvision.net.il>; Haag, William J Lt Col USAF EUCOM ECJ7 (USA) <william.j.haag.mil@mail.mil>
Subject: MSEL Update
Lt Col Ravid/Haag,
Just got off the phone with Tom Hooper and he confirmed SG is down on both sides (EUCOM/JS). Unfortunately, I was unable to load the templates on before it crashed so I’ve attached them here and will load them as soon as possible tomorrow morning when/if the system is up.
So, I think we are all in agreement that the MSEL review could have gone better today. The mikes, the masks, the screen issues all contributed. For my part, I wanted to apologize for not sending LtCol Ravid a heads up on the slides – between the JTIMS server delay and my ROM I was in a rush to get them done and just posted today. I will definitely let you know if I post anything to the MSEL folders in the future.
And, as Lt Col Ravid said, moving forward we will leave all the current injects in the JMSEL Tool and then all the Syndicates will work on their Level 1-2-3 charts. After the MSEL Crosswalk we can make the necessary adjustments. I am very pleased to hear this since this is the standard JS process used for Storyline-MSEL development. Experience has proven that MSELs/Storylines are best developed using the building block approach. It may seem like a step backward, and extra time but when the Quad/Fishbone slides are completely filled out, the MSEL inject will almost write itself so it is time very well spent. My analogy is painting a room. It’s all about the prep which always takes longer than actually painting. But if you do the prep right, the last part of throwing on the paint is a breeze.
Speaking of building blocks, I also have some concerns over the Training Objectives. It is the first block/step and I have yet to see a comprehensive, approved list. I have made “Placeholder TOs” in the tool but in theory all Storylines should first be based on a TO. I have seen some of the IDF TOs in the folder but I would like to discuss those over the SG phone soonest.
MSEL Crosswalk vs MSEL Sync. There is actually a difference. MSEL Development with a MSEL Crosswalk is what we are trying to accomplish this week during the Planning Phase. A MSEL Sync is only during PRE_STARTEX in the EXECUTION phase. (per Jt Staff Exercise Handbook)
Lastly, are the Syndicate slides. As was mentioned in the briefing, some of the storylines were from JC and in the wrong Phase and many of the dates were wrong even though I used the “approved” final versions from the IPC.
Bottom line is I think taking the time to step back now and review our steps is absolutely the best course.
If I may suggest,
Your thoughts?
v/r Ex
LINDA “EX” EXTERKATE
Joint Staff J7, JST, Valiant
JMSEL Manager
COMM: +1 (757) 203-7941 EST
DSN: (668) 203-7941
NIPR: Linda.M.Exterkate.ctr@mail.mil
SIPR: Linda.M.Exterkate.ctr@mail.smil.mil